The design incorporated the floor heights of the existing surgical area. The neurology department (which is at a different height) was linked up via a lift area at the western side.
The centre has 121 beds and part of the project was to provide for the organisational linkup of the cardiology and cardio-surgery departments. As well as the standard operating theatre groups, a “hybrid room” was provided in the catheter laboratory for the combination of operative and intervention therapy.
The design incorporated the floor heights of the existing surgical area. The neurology department (which is at a different height) was linked up via a lift area at the western side.
The centre has 121 beds and part of the project was to provide for the organisational linkup of the cardiology and cardio-surgery departments. As well as the standard operating theatre groups, a “hybrid room” was provided in the catheter laboratory for the combination of operative and intervention therapy.